Español Call 24/7 (305) FAST-⁠DRY
Job documentation

Every job here is written up with its readings.

Every job we complete produces a photo set and a set of readings. The jobs customers let us publish will appear here, with the readings printed next to the photographs.

01 · First three

The first three jobs we’ll write up

Each one is photographed and logged. The write-ups go up as the photographs come back.

What goes in each case study

Observed conditions, affected area, water category, starting, and final moisture readings, how many days it took to get dry, measured against a material the water never reached, and before and after photographs. Anything less than that is a gallery.

Project 1

Mold behind a bathroom wall, Coral Gables

The first job we'll write up here. What we found, how we sealed it off, the readings, and what the wall looked like when we closed it.

Category 1 4 days to standard
Project 2

Supply line failure in a Brickell stack

Three units, one file each. What the association saw, and what each owner received.

Category 1 4 days to standard
Project 3

A/C condensate into a Kendall ceiling

Six weeks of quiet water. How far it had traveled by the time anyone saw a stain.

Category 1 4 days to standard

These slots are reserved for finished jobs, published only with the customer's written permission: the room, the area, the date, and photographs taken from the same position before and after.